Re: Thanks Ron, check this out.

The voltages out of the transformer are AC = either test lead arrangement should indicate equally same when meter is set for AC Volts. If you have transformer leads correctly identified, then continuity test shows one side open & AC Volts as measured from that side should accordingly be Zero.