In Reply to: iFi Quality Control posted by Dynobot on August 16, 2015 at 11:49:38:
Using silicone bathtub sealer to secure a heavy metal bar in place wouldn't be my choice construction method.If one of those caps (the larger one?) came lose from the C4 position as marked on the PCB, it doesn't appear that it was ever soldered securely in the first place.
Was the bar glued to the inside top of the case 'hanging over' the component side of the PCB?
Edits: 08/17/15
This post is made possible by the generous support of people like you and our sponsors:
Follow Ups
- Were the 2 caps 'extra' or knocked off the PCB ? - AbeCollins 06:50:28 08/17/15 (2)
- RE: Were the 2 caps 'extra' or knocked off the PCB ? - Dynobot 17:21:54 08/17/15 (1)
- RE: Were the 2 caps 'extra' or knocked off the PCB ? - AbeCollins 17:45:52 08/17/15 (0)