Tweakers' Asylum Tweaks for systems, rooms and Do It Yourself (DIY) help. FAQ. |
|
In Reply to: RE: Running 2 Romex 10 gauge circuits thru the wall 20 feet posted by jea48 on November 24, 2014 at 13:19:22:
I asked you a loaded question. Sorry. It is up to each state to adopt or alter the NEC codes. Every state is different. I wanted to get you to use your head and leave your ego behind for a minute. In my response I tried to deal with what really happens and not the codes. DO you think it might be a good idea to find out what state he is from before explaining the rules? It is 6" from each box in Washington and will probably be for a long time.
It is not right, but I will explain how laws can be developed. Used to be that 1 ground stake was required in this state pounded in most of the way. One day an inspector tripped over it and sued the state. Now they require two ground rods pounded in below the surface.
This post is made possible by the generous support of people like you and our sponsors:
Follow Ups
- RE: Running 2 Romex 10 gauge circuits thru the wall 20 feet - cloudwalker 13:46:49 11/24/14 (7)
- Did your mother not breast feed you when you were a baby? nt. - jea48 14:02:29 11/24/14 (6)
- now this is the response I expected - cloudwalker 14:29:48 11/24/14 (5)
- RE: now this is the response I expected - jea48 09:01:14 11/26/14 (2)
- thank you for your time - cloudwalker 12:58:32 11/26/14 (1)
- Happy Thanksgiving . nt. - jea48 16:06:16 11/26/14 (0)
- Sorry but it takes two to tango - Awe-d-o-file 21:25:00 11/24/14 (1)
- I tried as hard as I could not to "tango" - cloudwalker 14:05:33 11/25/14 (0)