Home Pro Audio Asylum

Pro studio recording equipment and music production/industry.

RE: Building a Stage

64.179.181.85

you want the floor joist 12-14" apart from each other (gear is heavy). take 5 gal paint buckets and halfway fill them with sand, place them under the stage. take pieces of shag carpet and go across the floor joist under the stage and they need to be wide enough to touch the ground.


This post is made possible by the generous support of people like you and our sponsors:
  Signature Sound   [ Signature Sound Lounge ]


Follow Ups Full Thread
Follow Ups
  • RE: Building a Stage - drtechno 22:17:44 05/08/12 (0)

FAQ

Post a Message!

Forgot Password?
Moniker (Username):
Password (Optional):
  Remember my Moniker & Password  (What's this?)    Eat Me
E-Mail (Optional):
Subject:
Message:   (Posts are subject to Content Rules)
Optional Link URL:
Optional Link Title:
Optional Image URL:
Upload Image:
E-mail Replies:  Automagically notify you when someone responds.